How much does it cost to insulate a loft in the UK?

Loft insulation is a roll count. The area, and how much is already up there, decide how many rolls you need to reach 270mm. Anyone you hire to lay it is quoted separately, and that price varies by area.

Updated Based on manufacturer guidance, sources below

The short answer

The Energy Saving Trust recommends 270mm of mineral wool. From empty, lay 100mm between the joists and 170mm across them. Rolls = loft area / coverage per roll. An 8 x 6m loft is 48 m². On Knauf Loft Roll 44 combi-cut coverage, that is 5 rolls of 100mm and 8 rolls of 170mm. If you already have 100mm, you only buy the 8 rolls of 170mm.

Other brands cover a different area, so check the label. The loft insulation guide has the full working. Labour is not in that list.

Labour is not priced on this page. It is quoted separately and varies by area, so ask locally. Materials prices are not written here either: the button opens SmartBuild with your measurements and live prices from supplier feeds where we have them.

Work it out for your job

Change the measurements and the quantities update straight away.

Loft floor area
48 m²
Build-up
100mm + 170mm = 270mm

Your list

  • 5100mm rolls between the joists (11.09 m² each)
  • 8170mm rolls across the joists (6.5 m² each)
Price this loft insulation

Opens the loft insulation project in SmartBuild with your measurements filled in. The rolls are priced from supplier product feeds where we have them, ranked by price. Hatch insulation, pipe lagging and a tank jacket are extra.

How the numbers are worked out

The formula

  • Materials = rolls to reach 270mm. From empty that is 100mm between the joists and 170mm across them
  • Loft area (m²) = length x width. The floor area of the rooms below is close enough
  • First layer rolls = area / coverage per 100mm roll. Top-up rolls = area x 1.05 / coverage per roll
  • Labour, if you hire someone to lay it, is quoted separately and is not in the roll count

Worked example

An 8 x 6m loft with no insulation, using Knauf Loft Roll 44 combi-cut coverage (11.09 m² for 100mm, 6.50 m² for 170mm):

  • Area: 48 m²
  • 100mm between the joists: 48 / 11.09 = 4.3, so 5 rolls
  • 170mm across the joists: 48 x 1.05 / 6.50 = 7.8, so 8 rolls
  • Already at 100mm: only the 8 rolls of 170mm
  • Labour: quoted locally if you are not laying it yourself

Materials checklist

  • 100mm mineral wool rollsThe first layer, between the joists, when you are starting from empty. The button prices these.
  • 170mm mineral wool rollsThe second layer, laid across the joists, which takes 100mm up to 270mm.
  • Top-up rollsIf you already have some, the thinnest roll that takes you to at least 270mm. The calculator switches to that when you set what is already there.
  • Loft hatch insulationNot in the roll count. A bare hatch lets heat out, so add a jacket or a piece of insulation and a draught strip.
  • Pipe lagging and a tank jacketNot in the roll count. Lag the pipes and the cold water tank. Leave the ceiling directly under the tank clear so warmth from below can reach it.

You'll also need

  • A dust mask (FFP2 or better), gloves, goggles and long sleeves: mineral wool irritates skin, eyes and lungs
  • Crawl boards so you kneel on the joists, not on the ceiling plasterboard
  • Loft legs if you want to board over the insulation without squashing it
  • A registered electrician if recessed lights or cables will be covered and you are not sure that is safe
  • Someone to lay the rolls, if you are not doing it. That labour varies by area and is not on this page

Step by step

  1. Check what is already thereMeasure the depth. Many lofts already have some insulation, and a dry layer can stay. A top-up is a shorter list than starting from empty.
  2. Measure the loft floorLength times width. The floor area of the rooms below is close enough if the loft is awkward to measure.
  3. Lay the rolls to 270mmFrom empty, 100mm between the joists, then 170mm across them at right angles. Do not squash the rolls to fit stored boxes on top.
  4. Leave the loft able to breatheKeep the eaves clear so air can move. Insulate the hatch, and lag pipes and the tank rather than the ceiling under it.
  5. Price the rolls, then ask about labourThe button opens the list with live prices. If someone else is laying it, get that quoted locally. It is not in the materials total.

Tips from the manufacturers

  • Roll coverage varies by brand and thickness. These counts use the Knauf Loft Roll 44 data sheet for combi-cut rolls: 11.09 m² for 100mm, 7.35 m² for 150mm and 6.50 m² for 170mm. Check the label on the roll you buy.
  • Lay the top layer at right angles to the first, as the Energy Saving Trust and the Centre for Sustainable Energy advise. That covers the joists, which would otherwise let heat escape.
  • Keep the eaves clear so the loft does not get damp, and do not cover a recessed light unless it is rated to be covered. If you are not sure, ask a registered electrician before the insulation goes over it.
  • You do not have to top up an existing loft, but 270mm is the depth the Energy Saving Trust recommends, in line with the U-value expected when a loft is upgraded.

Mistakes to avoid

  • Pricing one layer and forgetting the second. From empty you need both 100mm and 170mm.
  • Squashing the insulation under boards or boxes. Compressed wool does much less. Use loft legs if you still want to store things up there.
  • Covering recessed lights that are not rated for it, or blocking the eaves. If the lights or the cables worry you, stop and ask a registered electrician.
  • Working without a mask and gloves, or standing on the plasterboard between the joists. Kneel on crawl boards.
  • Treating a labour price from another town as your price. Laying the rolls varies by area, and it is not on this page.

Frequently asked questions

How much does it cost to insulate a loft in the UK?

The materials are the rolls that take the loft to 270mm. An empty 8 x 6m loft is 5 rolls of 100mm and 8 rolls of 170mm on Knauf combi-cut coverage. Open the calculator for live prices on your loft. Labour is quoted separately and varies by area.

How many rolls do I need for 270mm?

Divide the loft floor area by the coverage on the roll. From empty, an 8 x 6m loft is 5 rolls of 100mm between the joists and 8 rolls of 170mm across them. If 100mm is already there, you only need the 8 rolls of 170mm.

Is loft insulation labour included?

No. This page is the materials. If you hire someone to lay the rolls, that quote is separate and depends on the loft and on where you live.

Can I lay loft insulation myself?

Many people do. Wear a mask, gloves and goggles, kneel on boards, keep the eaves clear, and do not cover lights or cables unless you know they can be covered. Ask a registered electrician if you are unsure.

Does 270mm include what is already there?

Yes. Measure what you have and top up to 270mm with the thinnest suitable roll, laid across the joists, as long as the old insulation is dry and in sound condition.

Sources

Quantities are estimates for typical jobs, using the coverage figures above. Products vary, so check the data sheet for the product you buy, and talk to a professional for structural, electrical or gas work. SmartBuild is independent and not affiliated with any of the manufacturers listed.