Project guide
How much does it cost to build decking in the UK?
Decking boards are the visible part. The frame underneath is joists, beams, posts and post mix, and that is where most lists go wrong. Labour to dig the holes and build the frame is quoted separately and varies by area.
The short answer
A 125mm board with a 5mm gap covers 130mm, so a 2.4m board covers 0.312 m². Boards = deck area / 0.312, plus 10%. A 4 x 3m deck needs 43 boards, 19 lengths of 47 x 150mm joist and beam timber, 4 x 3m posts cut into 12 short posts, and 24 bags of Postcrete.
The decking guide follows the Timber Decking and Cladding Association handbook. Labour is not in that list.
Labour is not priced on this page. It is quoted separately and varies by area, so ask locally. Materials prices are not written here either: the button opens SmartBuild with your measurements and live prices from supplier feeds where we have them.
How the numbers are worked out
The formula
- Boards (2.4m x 125mm) = length x width / 0.312 x 1.1
- Joists = length / 0.4 + 1, at 400mm centres. Beam lines = width / 2.4 + 1, rounded up
- Posts every 1.8m along each beam. Postcrete = 2 bags per 100 x 100mm post. Screws are about 40 per m²
- Labour to set the posts and build the frame is quoted separately. A deck over 30cm high usually needs planning permission in England
Worked example
A 4 x 3m deck, 0.3m above the ground, boards running along the 4m side:
- Boards: 12 m² / 0.312 = 38.5, plus 10% = 43 boards
- Joists: 4 / 0.4 + 1 = 11 at 400mm centres
- Beams: 3 / 2.4 + 1 = 3 beam lines (outer beams single, the middle beam doubled), 8 lengths. With the joists, that is 19 lengths of 47 x 150mm timber
- Posts: 3 lines x 4 = 12 posts, cut from 4 x 3m lengths. Postcrete: 24 bags
- At this height the joists hang between the beams on 44 joist hangers
Materials checklist
- Decking boards125mm boards, 2.4m long, with a 5 to 8mm gap. The area plus 10% is the board count, and the board you pick moves the bill more than the screws do.
- Joists and beams47 x 150mm treated timber. Joists at 400mm centres. Beam lines no more than 2.4m apart. This is the frame, not an optional extra.
- Posts100 x 100mm treated posts every 1.8m along each beam, with about 600mm in the ground.
- Postcrete2 bags per 100mm post in a 300 x 600mm hole, which is what Blue Circle allows for that hole.
- Decking screws2 per board at every joist, about 40 per m². Use coated or stainless exterior screws. Ordinary zinc screws rust and stain the boards.
- Weed-control fabric, gravel and stainFabric under the deck with about 50mm of gravel on it. Stain is optional: about 8 m² per 2.5L tin on grooved boards, for 2 coats.
You'll also need
- Joist hangers on a low deck, where the joists sit between the beams
- M10 coach bolts, 2 per post, hanger nails, joist-top tape and end-grain preserver for every cut end
- A spirit level, string line, saw, drill and spade. Know where drains and cables run before you dig
- A competent builder if the deck is fixed to the house, is well above the ground, or you are not confident about the frame. That quote varies by area
Step by step
- Measure, and choose the board directionBoards usually run along the longest side. Joists run the other way, at 400mm centres.
- Plan the beams and postsBeam lines no more than 2.4m apart, posts every 1.8m along each beam. A wide deck needs posts in the middle, not only at the edges.
- Check the height before you buildIn England a deck is usually permitted development if it is no more than 30cm above the ground and, with other extensions and outbuildings, covers no more than half the garden. Higher than that, ask the council. If it is fixed to the house or you are unsure the frame is up to it, use a competent builder.
- Set the posts and build the frameOnly dig once you know the ground is clear of drains and cables. A 100mm post in a 300 x 600mm hole takes 2 bags of Postcrete. Use ground-contact treated timber for the posts and the frame.
- Lay the boards and price the listLeave a gap between boards and use exterior screws. The button opens the materials with live prices. Digging and building the frame are labour, quoted locally.
Tips from the manufacturers
- TDCA guidance is 47 x 150mm C16 joists at 400mm centres, which can span up to about 2.97m. That is why the beams go no more than 2.4m apart.
- Buy ground-contact treatment (Use Class 4) for the posts and the substructure. The TDCA recommends it because that timber is hard to replace later.
- Leave 5 to 8mm between boards for drainage and movement. Use exterior-grade coated or stainless screws, not standard zinc screws.
- Blue Circle allows 2 bags of Postcrete for a 100mm post in a 300 x 600mm hole. Buy that rather than stretching one bag across two holes.
Mistakes to avoid
- Counting the boards and forgetting joists, beams, posts and Postcrete. The frame is most of the list.
- Using 47 x 75mm timber for the frame. It is too small to carry the joists.
- Putting posts only along the edges of a wide deck, or butting the boards tight so water sits in the joints.
- Building more than 30cm above the ground without checking planning rules, or taking a labour price from another part of the country. Labour varies by area and is not calculated here.
Frequently asked questions
How much does it cost to build decking in the UK?
Count the boards, the frame, the posts and the Postcrete for your deck. A 4 x 3m deck is 43 boards, 19 lengths of 47 x 150mm timber, 12 posts and 24 bags of Postcrete. Open the calculator for live prices. Labour is quoted separately and varies by area.
How many decking boards for a 4 x 3m deck?
About 43 boards of 2.4m x 125mm, including 10% for cuts and a 5mm gap. A 2.4m board covers 0.312 m² once the gap is allowed for.
What else is on the materials list?
Joists at 400mm centres, beams no more than 2.4m apart, 100mm posts every 1.8m, 2 bags of Postcrete per post, exterior screws, and fabric with gravel underneath. A low deck also needs joist hangers.
Is the builder included?
No. This page is the materials. Digging the holes and building the frame are labour, quoted locally. If the deck is fixed to the house or you are not confident about the structure, use a competent builder.
Do I need planning permission for decking?
In England, decking is usually permitted development if it is no more than 30cm above the ground and, together with other extensions and outbuildings, covers no more than half the garden. Higher decks usually need permission. Check with the council if you are unsure.
Sources
- TDCA Timber Decking Handbook 2022
- Blue Circle Postcrete data sheet
- Ronseal Ultimate Protection Decking Stain coverage
- Planning Portal: decking
Quantities are estimates for typical jobs, using the coverage figures above. Products vary, so check the data sheet for the product you buy, and talk to a professional for structural, electrical or gas work. SmartBuild is independent and not affiliated with any of the manufacturers listed.